3D-VR Design
In the coming era of Data Tech., digital 3D-VR models are worth a thousand words in lean construction to solve communication problems caused by 2D design between customer and professional engineers in the past 30 years.
With VR experience, design approvals can be achieved at faster rates. Customer and engineers can enter a same virtual world at different locations and easily communicate any design changes in real time. Before purchase decision is made, the virtual
product can be experienced for additional customization.
Our engineers can physically step into their design spaces with 3D VR and receive a more ‘real’ and tangible experience of the creation. 3D VR provides them with opportunity to realize flawed ideas before they turn into bigger issues and reducing their expense.
INTEGRATED LEAN PROJECT DELIVERY (ILPD)
Integrated Lean Project Delivery (ILPD) is the way to change traditional construction that is closely linked to lean manufacture for eliminating waste on site across the value chain of whole project.
The point of the business model for construction is setting up long-term relationships based on additional value of what the supply chain delivers, improving quality and
reducing unexpected costs through reducing waste and rework.
BIM FAMLITY
As an official research of BIM usage in Europe illustrated, almost 50% more or less respondents reported that the main advantage of BIM (Building Information Model) was to reduce errors and omissions in design phase.
This simple factor already implies a further reduction of time, materials and costs, so it becomes the engine that pulls other
advantages. Hence, BIM family of Standard facility system has been developed by RG-Energy for customer to easily embed them into BIM model of entire project. The easy integration can save MEP designers a lot of cost and time in designing machine room for HVAC or Cooling system.